News LIVE
🔑 Log in
Ad
Pakistan

Keti Bandar Port Phase-I to Cost $522mn, China Harbour Engineering Co. Involved

Monday, 24 August 2026 · 12:50 PM PKT · PakGold News Desk · 👁 10

The proposed Phase-I development of Keti Bandar Port in Sindh is estimated to cost $522.34 million, involving a 500-metre multi-purpose terminal. China Harbour Engineering Company (CHEC) presented the conceptual master plan for this new deep-water maritime gateway, aiming to strengthen Pakistan's port and logistics network. President Asif Ali Zardari welcomed the Chinese delegation, emphasizing integrated development with reliable connectivity and essential facilities. While a long-term positive for Pakistan's economic infrastructure, this development is unlikely to have an immediate, direct impact on gold or currency rates.

بحوالہ / Source: www.brecorder.com

Ad

سندھ میں مجوزہ کیٹی بندر پورٹ کے فیز-1 کی ترقی پر تقریباً 522.34 ملین ڈالر لاگت کا تخمینہ لگایا گیا ہے، جس میں 500 میٹر کا کثیر المقاصد ٹرمینل شامل ہے۔ چائنا ہاربر انجینئرنگ کمپنی (CHEC) نے اس نئے گہرے پانی کے سمندری گیٹ وے کا تصوراتی ماسٹر پلان پیش کیا، جس کا مقصد پاکستان کے پورٹ اور لاجسٹکس نیٹ ورک کو مضبوط کرنا ہے۔ صدر آصف علی زرداری نے چینی وفد کا خیرمقدم کیا اور مربوط ترقی پر زور دیا جس میں قابل اعتماد سڑکوں کا رابطہ اور ضروری سہولیات شامل ہوں۔ اگرچہ یہ پاکستان کے اقتصادی انفراسٹرکچر کے لیے طویل مدتی مثبت پیش رفت ہے، لیکن اس کا سونے یا کرنسی کی شرح پر فوری، براہ راست اثر ہونے کا امکان نہیں ہے۔

بحوالہ / Source: www.brecorder.com

Share: WhatsApp X
Ad

🗞 More News